Good day to you.
Attention is drawn to engineering work outside the two ordinary classrooms.
Another building, located in the Ma102 outer-wood area, will begin construction today, with the barway opening for a while, the entrance to and from the second-floor stairs, and the perimeter, which will be secured, will be closed, and the students will remain in and out of the former anti-generic station, in order to avoid danger.