跳到主要內容區塊
Wednesday, 01 November 2023 11:11

Construction announcement!

I. 112.11/4 (vi)-11/5 (days) of the project to de-scrutinize and clear a wall of one or two large galleries, which would cover a south side parking lot (within the red box below), which would affect the safety of the vehicle as a result of the demolition and cleaning of large engineering vehicles, and to move the student to his other parking area for two days of 112.11/4 (vi)-11/5 (days).

ii. Interruption of classes, resulting in inconvenience.

 

Downloads

© 2025 》 National Yunlin University of Science and Technology  Designed by:Office of Library & Information Services  

Email  Tel:05-5342601#5011